πŸ•’ How Long Does Wall Rendering Take?

If you’re planning to render your home or a commercial property, you’re probably wondering: β€œHow long will it take?” The answer depends on several factors – but here’s a general guide to help you understand the timeline.


🏑 Average Time for Wall Rendering

For an average 3-bedroom house, external wall rendering usually takes 7 to 10 days from start to finish. This includes:

  • βœ… Surface preparation
  • βœ… Applying base coats
  • βœ… Mesh embedding (if needed)
  • βœ… Drying time between layers
  • βœ… Final render and finishing touches

πŸ” What Affects the Timeline?

Several things can speed up or slow down the job:

1️⃣ Weather Conditions – Rain or low temperatures can delay drying and affect quality. Summer and early autumn are ideal.
2️⃣ Type of Render – Some materials like monocouche or silicone render dry faster and require fewer layers.
3️⃣ Surface Area – Bigger houses or properties with complex shapes take longer.
4️⃣ Repairs Needed – Damaged or cracked walls may need patching or re-plastering before rendering begins.
5️⃣ Access & Scaffolding – Tight spaces or high buildings require more setup time.


πŸ› οΈ Can It Be Done Faster?

Yes! Using spray render machines or experienced teams can reduce the time, especially on larger surfaces. However, quality should never be rushed – proper drying time between coats is essential for durability.