π How Long Does Wall Rendering Take?
If you’re planning to render your home or a commercial property, you’re probably wondering: βHow long will it take?β The answer depends on several factors β but hereβs a general guide to help you understand the timeline.
π‘ Average Time for Wall Rendering
For an average 3-bedroom house, external wall rendering usually takes 7 to 10 days from start to finish. This includes:
- β Surface preparation
- β Applying base coats
- β Mesh embedding (if needed)
- β Drying time between layers
- β Final render and finishing touches
π What Affects the Timeline?
Several things can speed up or slow down the job:
1οΈβ£ Weather Conditions β Rain or low temperatures can delay drying and affect quality. Summer and early autumn are ideal.
2οΈβ£ Type of Render β Some materials like monocouche or silicone render dry faster and require fewer layers.
3οΈβ£ Surface Area β Bigger houses or properties with complex shapes take longer.
4οΈβ£ Repairs Needed β Damaged or cracked walls may need patching or re-plastering before rendering begins.
5οΈβ£ Access & Scaffolding β Tight spaces or high buildings require more setup time.
π οΈ Can It Be Done Faster?
Yes! Using spray render machines or experienced teams can reduce the time, especially on larger surfaces. However, quality should never be rushed β proper drying time between coats is essential for durability.